
Safe Concordia was constructed at the Keppel FELS shipyard in Singapore and was delivered in March 2005.
The Safe Concordia is fitted with a Class 2 Dynamically Positioning system with four 2 500 kW thrusters that enable the unit to safely operate alongside a fixed platform without the use of a conventional anchoring system.
The DP system is low on fuel consumption and provides flexibility, enabling the vessel to move to another location in a relatively short period of time during operation at an oil field installation. With a large operating deck and a crane that is able to lift 120 tonnes, the rig can manage most of the operations required by the customer.
| Rig data | |
| Registered name | Safe Concordia |
| Built | 2005 |
| Max no of beds | 390 |
| Design | Deepwater Technology Group |
| Deck area | 1 300 m2 (laydown) |
| Payload | 1 400 t/m2 |
| Power generation | 18 000 kW (5 diesel generator sets) |
| Fresh water production | 160 tonnes / 24 hours |
| Gangway | Telescopic 29.5 +/- 5 m |
| Mooring system | 4 Point Wire Winches |
| Station keeping | DP2 |
| Thrusters | 4 x 2.5 MW Azimuthing |